Public access landing pontoon suitable
for disabled use using minimal piles.
Design
Solution:
The intrinsic strength of the tubes
enabled just 5 piles to be used over this substantial structure.
Two fixed bridges combined with a hinged section ensures that the
gradient is always acceptable for disabled access.